Page 23 - 上海中楷(集团)有限公司
P. 23

THE SOLUTION OF
                                                                                           19/20 ELECTRIC AND ENERGY






          合同能源管理             Contract Energy Management


          合同能源管理机制的实质是:一种以减少能源费用来支付节能项目全部成本的节能投资方式。这样一种节能投资方式允许用户使用未来的节能收益为工程
          和设备升级,以降低目前的运营成本。
          ◆ 零投资   运营商不用资金投入即可完成节能技术改造。
          ◆ 零风险    EMC-BT 公司承担技术和经济风险,能耗企业支付给 EMC-BT 的款项来自能源节约所带来的项目效益。
          ◆ 高收益    合同结束后设备和后续全部节能效益归能耗企业。
          The essence of contract energy management mechanism is: an energy saving investment mode to pay the overall cost of energy saving
          project by reducing the energy cost. This kind of energy saving investment mode allows users to upgrade project and equipment with the
          energy saving revenue in the future, so as to reduce the current operating cost.
          ◆ Zero investment    The operator can complete the energy saving technology transformation without funding.
          ◆ Zero risk   EMC-BT company assumes technical and economic risks, and the amount paid by energy consumption enterprise to EMC-BT
                                 comes from the project benefit of energy saving.
          ◆ High yield   After the contract is completed, the equipment and all the subsequent energy saving benefits will belong to the energy consumption
                                  enterprise.







                                                            能源费用 Energy cost



                                                                                                 上海中楷节能效益分享
                                                                                                 Shanghai Zhongkai energy
                                                                                                 saving benefit sharing
                                                                                                 客户节能效益分享
                                                                              项目实施前能源费用          Customer energy saving
                                                                                                 benefit sharing




                                                                                                 项目实施后能源费用
                                                                                                 The energy cost after
                                                                                                 project implementation


                                                                            The energy cost before project implementation
                                                                                                        时间 Time

                                                         目前我集团可以进行合同能源管理的项目有:保温材料、变频改造、LED 改造、
                                                         热能改造、分布式光伏发电
                                                         Currently, the projects applicable to contract energy management in our
                                                         group include: thermal insulation material, frequency conversion retrofit, LED
                                                         transformation, thermal transformation and distributed photovoltaic power
                                                         generation.












                                                                                      Zhongkai Group  www.shzk1998.com
   18   19   20   21   22   23   24   25   26   27   28