In the assembly hall the specialized units are first pre-
        assembled. This division allows us to devote the neces-
        sary care to obtaining a perfect balance with, and a cor-
        rect assembly of the various components. In   the  next
        stage  the  cubicles  are assembled. This stage is subject
        to strict assembly procedures.


        After assembly, all cubicles undergo an extremely
        thorough control. The electrical tests include resistance
        measurements on the circuit breaker switch and earthing
        switch. The cubicle is subjected to a voltage test of 28 kV
        / 1 min. The most striking test is the one where the clos-
        ing speed of the load break switch and earthing switch
        is measured. One can even check the post-vibration of
        the electrical  points during switching on a digital screen.
        The mechanical tests are used to check all fitting mate-
        rial, and to examine the correct positions of parts and in-
        terlocks.
                                                                   “Our cubicles are

        Right before being dispatched  the cubicles  will undergo
        a final control; this is where custom, optional features will   resistant to corrosion
        be installed and checked separately.
                                                                   and have a long life
        The cubicle is now ready for dispatch ... to a happy and
        satisfied customer!                                        span...”






































 THE SPECIALIST IN MEDIUM VOLTAGE SWITCHGEAR  BUILT TO LAST                                                      17