应用领域 /Application field



             风力发电、光伏发电、海上风电、分布式光伏发电
             等新能源领域升压站
             电网 110kV~40.5kV 变电站

             大型厂矿企业自用变电站
             Wind  power  station,  photovoltaic  power
             generation, offshore wind power, distributed
             photovoltaic power generation and other new
             energy field booster stations
             Power grid 110kV~40.5kV substation
             Large-scale factory and mine enterprise self-
             use substation


          模块化智能预制舱与传统变电站比较 /Modular intelligent prefabrication cabin compared with traditional substation



           项目                             常规户外变电站                               FATENG 预制舱式变电站

           占地面积                           约 3000 平方米                                约 2000 平方米

                                                                    全站为整体预装,所有设备工厂预制,现场安装即可,施工周
           施工周期                            约 3~4 个月
                                                                                    期短,1~2 个月
           线缆用量                    设备分散布置,一、二次线缆用量大                  设备高度集成布置,电气距离缩短,能节约 30% 左右线缆

                                 环境要求高,风沙、凝露等环境恶劣地区                 采用全金属舱体设计,IP54 防护等级,配有完善的暖通系统,
           环境要求
                                          对设备危害很大                            可防风沙、凝露,提升设备可靠性
                                       建筑物多,施工成本高;                  装配式设计,全站取消建筑物,施工费用低;全部设备由法腾
           施工及管理成本
                                  设备由不同厂家提供,协调管理成本高                     电力提供,并负责全部安装调试工作,管理成本低
           运维费用               敞开式设计,受环境等影响大,运行、维护成本高                 封闭式设计,基本不受环境等外部条件影响,运维成本低



           project                 Conventional outdoor substation          FATENG prefabricated substation

           Floor area                About 3,000 square meters                 About 2,000 square meters
                                                                      The whole station is pre-assembled as a whole all
           Construction period           About 3~4 months             equipment factories are prefabricated and can be
                                                                    installed on site. Short construction period, 1~2 months

                                                                         The equipment is highly integrated and the
                              Distributed equipment,large amount of primary
           Cable usage                                               electricaldistance is shortened, which can save about
                                       and secondary cables
                                                                                   30% of the cable.
                              High environmental requirements, harsh areas  Full metal cabin design, IP54 protection, complete HVAC
           Environmental     such as sand and condensation Very harmful to   Syste to prevent sand and condensation and improve
           requirements
                                            equipment                             equipment reliability
                                                                      Pre-installed design, the whole station cancels the
                              There are many buildings and the construction   building, the construction cost is low; all equipment
           Construction and   cost is high;The equipment is provided by different   isProvided by the company, and responsible for all
           management costs  manufacturers,and thecoordination management
                                           cost is high.            installation and commissioning work, low management
                                                                                       costs
                                                                       Closed design, basically independent of external
           Operation and      Open design, high impact on the environment,   conditions such as the environment, low operating and
           maintenance cost      high operating and maintenance costs
                                                                                  maintenance costs